README

-- encoding: utf-8; indent-tabs-mode: nil --

This sub-directory contains utility progams used for developping the Date::Calendar::Bahai module, especially its test files.

gener-tests

This script builds test data to include in t/05-conversion.rakutest. These test data are generated from the Perl module Date::Converter.

How to use

Run the script from the command line, redirecting stdout to a temporary file. Do not bother with stderr.

Insert the test data in t/05-conversion.rakutest and add manually the commas required for the list values.

gener-week-tests

This script helps building data to check the week-related attributes in Baháʼí dates objects. It uses a partially implemented Date::Calendar::Bahai module.

First Step

Comment out then list(... True) lines and uncomment the list(... False) line.

Run the script.

Check that the displayed days of week correspond to the real days: compare with what https://funaba.org/cc gives.

  • Jalál → Saturday

  • Jamál → Sunday

  • Kamál → Monday

  • Fiḍál → Tuesday

  • ʻIdál → Wednesday

  • Istijlál → Thursday

  • Istiqlál → Friday

Find the three cases where the week-year is 53-week long, and choose year-intervals that include them and type these intervals in the list(... True)lines.

The three cases are as follows:

  • Normal year beginning on Fiḍál (e.g. year 174),

  • Leap year beginning on Kamál (e.g. year 168),

  • Leap year beginning on Fiḍál (e.g. year 180).

Please note that you have to read two successive lines, the first one for the beginning of the year, the second one for the year type: normal / leap.

Second Step

Comment out the list(... False) line and uncomment the list(... True) lines. Update the span of years in this line to include the samples chosen in the first step.

Run the script, redirecting stdout to a text file.

Edit this file. On each line, update the nnnn-Wnn-n value. From right to left:

  • Check that the day-of-week is the proper one.

  • Change the week number from "00" to the proper value, "01", "02", "51, "52" or even "53".

  • Change the week-year value by adding or subtracting 1 to the current value (which has been initialised with the normal year value).

For number litterals (month numbers, day numbers and day-of-year numbers), remove the leading zeros, e.g. replacing "001" by "1" preceded by two spaces and replacing "02" by "2" preceded by one space.

Insert the resulting source text into t/07-week.rakutest.

Date::Calendar::Bahai v0.1.0

Conversions from / to the Baháʼí calendar

Authors

  • Jean Forget

License

Artistic-2.0

Dependencies

Date::Calendar::Strftime

Test Dependencies

Provides

  • Date::Calendar::Bahai
  • Date::Calendar::Bahai::Astronomical
  • Date::Calendar::Bahai::Common
  • Date::Calendar::Bahai::Names

The Camelia image is copyright 2009 by Larry Wall. "Raku" is trademark of the Yet Another Society. All rights reserved.